Removing Blade; Installing Torque Tubes; Removing And Installing Blade; Torque Tube Installation - Martin HD QB1 Operator's Manual

Table of Contents

Advertisement

B
A

Removing blade

F
Installing torque
tubes
Martin Engineering M4101-01/19
A. Set Screw
B. Blade Clamp
C. Blade Clamp
Figure 4. Removing and Installing Blade
Blade clamps should remain captive to mainframe assembly
during blade removal and installation.
1. Loosen set screws (A) from operator side of mainframe (E).
2. Disengage blade clamp (B) from blade cartridge (D).
3. Pull blade cartridge away from blade clamp (C) and remove from
mainframe.
Figure 5. Torque Tube Installation
1. Insert torque tube (F) into mainframe (E).
2. Slide torque tube collar (G) onto torque tube.
3. Align collar (G) with mainframe. Tap collar into mainframe with hammer
until collar is fully engaged in mainframe.
C
E
D. Blade Cartridge
E. Mainframe
NOTE
E
8
D
Blade stop removed for clarity.
G
®
Martin
HD QB1™ Cleaner

Advertisement

Table of Contents
loading

Table of Contents