Installation of EKRP1HB is required.
3 Fix the cable with cable ties to the cable tie mountings.
8.2.9
To connect the power consumption digital
inputs
Wires: 2 (per input signal)×0.75 mm²
Power limitation digital inputs: 12 V DC / 12 mA detection
(voltage supplied by PCB)
[9.9] Power consumption control.
1 Open the following (see
"6.2.2 To open the indoor
1 Top panel
2 User interface panel
3 Front panel
4 Main switch box cover
2 Connect the power consumption digital inputs cable to the
appropriate terminals as shown in the illustration below.
EGSAH/X06+10DA9W(G)
Daikin Altherma 3 GEO
4P569820-1A – 2019.09
unit" [ 4  24]):
1
2
4
3
5
4
3
2
a
Installation of EKRP1AHTA is required.
3 Fix the cable with cable ties to the cable tie mountings.
8.2.10
To connect the safety thermostat
(normally closed contact)
Wires: 2×0.75 mm²
Safety thermostat contact: 16 V DC detection (voltage
supplied by PCB)
[9.8.1]=3 (Benefit kWh power supply = Safety
thermostat)
1 Open the following (see
"6.2.2 To open the indoor
1 Top panel
2 User interface panel
3 Installer switch box cover
2 Connect the safety thermostat (normally closed) cable to the
appropriate terminals as shown in the illustration below.
8 Electrical installation
1
a
unit" [ 4  24]):
1
Installer reference guide
3
2
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents