8 Electrical installation
M2S
2×
NO
X2M
1×
3 Fix the cable with cable ties to the cable tie mountings.
8.2.4
To connect the electricity meters
Wires: 2 (per meter)×0.75 mm²
Electricity meters: 12 V DC pulse detection (voltage supplied
by PCB)
[9.A] Energy metering
INFORMATION
In case of an electricity meter with transistor output, check
the polarity. The positive polarity MUST be connected to
X5M/6 and X5M/4; the negative polarity to X5M/5 and
X5M/3.
1 Open the following (see
"6.2.2 To open the indoor
1 Top panel
2 User interface panel
3 Installer switch box cover
2 Connect the electricity meters cable to the appropriate terminals
as shown in the illustration below.
Installer reference guide
38
1×
NC
OR
X2M
1×
unit" [ 4 24]):
1
3 Fix the cable with cable ties to the cable tie mountings.
8.2.5
To connect the domestic hot water pump
Wires: (2+GND)×0.75 mm²
DHW pump output. Maximum load: 2 A (inrush), 230 V AC,
1 A (continuous)
[9.2.2] DHW pump
[9.2.3] DHW pump schedule
1 Open the following (see
1 Top panel
2 User interface panel
3 Installer switch box cover
2 Connect the domestic hot water pump cable to the appropriate
terminals as shown in the illustration below.
3
2
S3S
S2S
2×
1×
X5M
1×
unit" [ 4 24]):
"6.2.2 To open the indoor
EGSAH/X06+10DA9W(G)
Daikin Altherma 3 GEO
4P569820-1A – 2019.09
1
3
2