Battery Test
After you select the battery test type and click Submit, the SNMP IPv6 will
send the command to the UPS to enable the battery test accordingly.
z
Shutdown & Restart UPS Only
After you confirm your setup, the SNMP IPv6 will send the command to the
UPS to shut down or/ and restart the UPS.
If you want to shutdown the UPS, please check the UPS Shutdown Delay
box and key in delay time.
If you want to restart the UPS, please check the UPS Restart Delay box and
key in delay time.
If you want to shutdown and restart the UPS, please check both of the box-
es and key in according delay time.
z
Smart Shutdown
The Smart Shutdown configuration is used to safely shutdown all of the
connected computers and the UPS. First of all, you should estimate the lon-
gest OS Shutdown Delay time for your operating systems that have been in-
stalled shutdown software and connected to the SNMP IPv6. The SNMP IPv6
will delay the assigned OS Shutdown Delay time and wait for all operating
systems' shutdown. After that, the SNMP IPv6 will send the assigned UPS
shutdown-delay command to the UPS and turn off the UPS.
z
Outlet Control
Press the Switch Bank button to control the UPS output relay (on or off ).
z
Power Fail/ Restore Simulation
Click Power Fail Test or Power Restore Test button to let the SNMP IPv6
simulate UPS power failure or power restore event. This function allows you
to test all of the connected software and verify whether they work properly
or not. Please note that the simulation won't influence UPS operation, the
UPS remains in its original operation mode and won't transfer to battery
mode.


Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the InsightPower SNMP IPv6 for UPS and is the answer not in the manual?

Questions and answers

Table of Contents