Samson TROVIS 5724-8 Mounting And Operating Instructions page 24

Electric actuators with process controller for heating and cooling applications
Table of Contents

Advertisement

Mounting and start-up
− Connect the actuator to the electrical net-
work only after the supply voltage is first
switched off. Make sure the power cannot
be switched on unintentionally.
Upon delivery, the sensors and the connect-
ing cable are already connected to the ter-
minals of the electric actuator with process
controller.
DANGER
!
Risk of electric shock at switching output L' in
device versions B and D after connecting the
supply voltage.
The switching output L' may be live. Do not
touch the switching output L'.
Î Connect the connecting cable to the
supply voltage (see Table 3).
Î Install the ready-wired sensors depend-
ing on the application.
Table 3: Color code
Two-wire connecting
cable
Three-wire
connecting cable
Tip
All ready-configured applications are de-
scribed in the Configuration Manual
u KH 5724-8. Refer to the plant schemes to
find out where the sensors are preferably to
be mounted for an application.
24
N
Blue
L
Brown
N
Blue
L
Brown
L'
Black
Î Switch on supply voltage.
On starting up the actuator for the first
time, the error reading E7 (no initializa-
tion performed) is displayed.
Î Start initialization (see section 5.4).
NOTICE
!
After an actuator which has already been
initialized is connected to the supply voltage,
a zero calibration is automatically per-
formed, during which the actuator stem fully
extends or retracts depending on how A8.1
configuration item is set. After the zero cali-
bration is completed, the actuator starts
closed-loop operation. The default settings
cause the actuator stem to extend during ze-
ro calibration.
EB 5724-8 EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trovis 5725-8

Table of Contents