4 Testing and Maintenance
The following symbols are used in the diagrams illustrating the safety tests:
L, N
.........
The IntelliVue G1 and the IntelliVue G5 are protected against the effects of defibrillation and
electrosurgery.
CAUTION
After each service, maintenance or repair event:
Ensure all fuses accessible from the outside comply with the manufacturer's specification.
Check:
• the integrity of mechanical parts, internally and externally.
• any damage or contamination, internally and externally.
• that no loose parts or foreign bodies remain in the device after servicing or repair.
• the integrity of all relevant accessories.
46
Supply mains
Supply mains terminals
Mains part
F-type applied part
Resistance measuring device
Optional connection
Protective earth
PE
Protective earth terminal
Applied part
Measuring device
Connection to accessible
conductive parts
Safety Tests