Page 3
STEP 1 DIAGRAM 1b (Existing 40853) Curb Side Existing Cross Bow (-001) Side Tube (-012) STEP 2 Install support angle (-014) per [DIAGRAM 1c] using 2 each 3/8 x 1 carriage bolts (a), 2 each 3/8 flat washers and 2 each 3/8 nylock nuts (c). Install into third square hole from the end of cross bow (-001).
Page 4
STEP 3 Next, insert bushing (-013) into support angle (-014) flange side in per [DIAGRAM 2a]. Next, insert bushing (-013) into bracket plate(-015) as shown in [DIAGRAM 2b]. Support Angle (-014) DIAGRAM 2b Cross Bow (-001) Flange Side Flange Side Bushing (-013) Bushing...
Page 5
STEP 6 Next, install handle (-002) to the end of tube assembly (-016) using 1 each 5/16 x 2 3/4 hex bolt (g), 2 each nylon washers (-038), 2 each 5/16 flat washers (k), 1 each 5/16 nylock nut (h). Note: insert washers (-038 ) over and under handle tube (-002) per [DIAGRAM 3].
Page 6
STEP 8 DIAGRAM 7 Install pad bracket (-026) using 1 each 3/8 x 1 carriage bolt (m), 1each 3/8 flat washer (b), 1 each 3/8 nylock nut (c) shown in [DIAGRAM 7]. Pad Bracket Do not tighten for later adjustment. (-026) Now install the clamp pads (-034) to pad bracket (-026) and tube assembly (-020) per...