Download Print this page

Zephyr Genova Series Installation Manual page 9

Advertisement

Fig.11
10) Place 6" round ducting over blower collar and secure
with aluminum duct tape. If using hood in ductless
recirculating mode turn to page 13.
Install electrical wiring. Note: A cable lock (not
included) may be required by local codes. Check
with local requirements and codes, purchase and install
appropriate connector if necessary.
Make sure no packing material is inside hood. Power
up hood check for leaks around duct tape and verify all
functions.
Fig.12B
12) Place front panel back on hood body and secure in
place by using the (10) screws previously removed from
step 2.
11) Secure (2) 1" wood screws (A) into the screw holes on
the hood body to the cabinet base and prevent the hood
from shifting after installation.
12
www.zephyronline.com
A
Fig.12A

Advertisement

loading
Need help?

Need help?

Do you have a question about the Genova Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Zge-e36asZge-e30asZge-e30as290Zge-e36as290