Download Print this page

Advertisement

Quick Links

www.zephyronline.com
Genova
ZGE-E30AS
ZGE-E36AS
ZGE-E30AS290
ZGE-E36AS290
Model number:
Serial Number:
APR14.0401 © Zephyr Corporation

Advertisement

loading

Summary of Contents for Zephyr Genova Series

  • Page 1 Genova ZGE-E30AS ZGE-E36AS ZGE-E30AS290 ZGE-E36AS290 Model number: Serial Number: APR14.0401 © Zephyr Corporation...
  • Page 2 Equivalent number Equivalent number Duct pieces Duct pieces length x used T otal length x used T otal 3- 1/ 4” x 10” 1 Ft. 6”- 8” Round 30 Ft. Rect., wall cap straight with damper 7” Round, 1 Ft. 6”- 8”...
  • Page 3: Damage - Shipment/Installation

    www.zephyronline.com Mounting height from top of cooking surface to bottom of hood should be no less than 24” and no more than 32”. It is important to install the hood at the proper mounting height. Hoods mounted too low could mounted too high will be hard to reach and will If available, also refer to range manufacturer’s height clearance requirements and recommended...
  • Page 4 WARNING FIRE HAZARD NEVER exhaust air or terminate duct work into spaces between walls, crawl spaces, ceiling, attics or garages. All exhaust must be ducted to the outside, unless using the recirculating option. Use single wall rigid Metal ductwork only. Ducting Options Example roof pitch w/ flashing &...
  • Page 5 www.zephyronline.com front of hood side of hood 2 " 16 " 242mm 500mm 16 " 8 " 6 " 4 " 760mm 912mm 153mm 286mm 4 " 8 " 35mm top of hood 16 " 180mm junction box blower outlet...
  • Page 6 7” ” 7/8” Fig.1 front edge glass handle Fig.2 1. Determine and mark center line on wall and cabinet bottom with a pencil. 2. If the cabinet bottom is recessed, wood blocking must be installed to ensure proper within cabinet bottom. 3.
  • Page 7 www.zephyronline.com WARNING: Electrical wiring must be done by a qualified person(s) in accordance with all applicable codes and standards. This range hood must be properly grounded. Turn off electrical power at service entrance before wiring. 1) Prepare electrical wiring and ducting in cabinet. Location of junction box and blower outlet can be found on page 8. Fig.3 Fig.4 2) Unscrew the (10) screws from front panel and place...
  • Page 8 Fig.7 Fig.8 6) Place lower installation brackets under upper installation 7) From inside the hood, secure (1) M4x8 screw into brackets located on left and right sides of hood body, each lower installation bracket. The position of this Fig.7. Note: The wider portion of the lower installation screw is adjustable to accomodate various cabinet bracket should be at the bottom.
  • Page 9 www.zephyronline.com Fig.11 Fig.12A 10) Place 6” round ducting over blower collar and secure 11) Secure (2) 1” wood screws (A) into the screw holes on with aluminum duct tape. If using hood in ductless recirculating mode turn to page 13. the hood body to the cabinet base and prevent the hood from shifting after installation.
  • Page 10 Ductless recirculation is intended for applications where an exhaust duct work is not possible to be installed. When converted, the hood functions as a recirculating hood rather than an exhaust hood. Fumes and exhaust within the home. We recommend to ALWAYS exhaust air outside of the home by employing existing or installing new duct is not possible should you recourse to converting the hood into a recirculating hood.

This manual is also suitable for:

Zge-e36asZge-e30asZge-e30as290Zge-e36as290