Completing The Installation - Cabletron Systems 6E233-49 SmartSwitch 6000 User Manual

Interface module
Hide thumbs Also See for 6E233-49 SmartSwitch 6000:
Table of Contents

Advertisement

Completing the Installation

b.
Verify that the RJ21 connector associated with the twisted pair segment has the proper
pinouts and check the cable for continuity.
c.
Check that the twisted pair connection meets the dB loss and cable specifications outlined
in
Chapter
2.
If a link is not established, contact Cabletron Systems. Refer to
6.
Repeat steps 1 through 5 until all connections are made.
3.6
COMPLETING THE INSTALLATION
After installing the SmartSwitch and any optional HSIM, and making the connections to the
network, the SmartSwitch is ready to be configured through Local Management. Refer to
SmartSwitch Series 6H202, 6H203, 6H252, 6H253, 6H258, 6H259, 6H262, 6E233, and 6E253
Local Management User's Guide for information on how to access and use Local Management.
Refer to
Chapter 4
for information on LEDs and troubleshooting.
3-8
Installation
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Section 1.2
for details.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 6E233-49 SmartSwitch 6000 and is the answer not in the manual?

Questions and answers

Table of Contents