Exploded Drawing - Yoshitake GP-1200 Installation And Operation Manual

Pressure reducing valve
Table of Contents

Advertisement

8.5 Exploded drawing

Parts with in the flame are consumable. Please contact us for purchase of these consumable parts.
Note (*): Apply a liquid sealant for heat and steam resistant (Recommendation: NEVER
SEEZ Standard grade) to the sealing surface of the diaphragm bottom and the top
cover, and pilot diaphragm top and the cover.
Name of parts
5
Diaphragm
14
Piston ring
15
Inner ring
Pilot valve assembly
17・18
22
Gasket
Gasket
24・25
26
Strainer
28
Gasket
8
Pilot diaphragm
‑12‑
Replace period
2 years
3 years
3 years
5 years
5 years
2 years
5 years
2 years
2 years
■EPDT-101■

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gp-1210

Table of Contents