Grounding Notes:
The ground wire adopts yellow-green wire that is no smaller than 16 mm² .
Grounding principle: as near as possible.
The base station connects to the reliable outdoor grounding point (earth) through
one ground screw.
The connection of the grounding points and the ground bar need to be tight and
reliable. Rustproofing the terminals is required. This can be done with rust
preventing paint, anti-oxidation coatings, grease, and so on.
2.6

Weatherproof Protection

The mBS31001 adopts cold shrink tube for weatherproof protection. Before installing the
cold shrink tube, clean up the interface first. The weatherproof protection steps are as
follows:
1.
Insert cable into cold shrink tube.
2.
Tighten the connector.
3.
Push the cold shrink tube to the top joint and pull out the strip.
4.
Check whether the cold shrink tube tight connect with the connection.