Pre-use checklist
1. Connect the source gases to system.
2. Connect the power to system.
3. Check that the patient circuit support is installed on the system.
4. Connect the patient circuit and the humidifier to the system.
5. Connect the patient circuit control and pressure sense lines to the system.
6. Turn on the power.
7. Check that the source gas lights are off.
8. Check that the start/stop light is off.
9. Check that the alarm silence light is on.
10. Perform the patient-circuit calibration described in the following section.
11. Perform verification performance.
12. Perform the alarm-check procedure as described in the Operators Manual.
6