Maintenance and cleaning

7
Maintenance and cleaning
CAUTION
Risk of injury from following incorrect procedure.
Maintenance and repair work must only be carried out by authorised and trained (specialist) personnel.
¾
Maintenance and repair work must only be carried out when the system has been disconnected from the
¾
power supply. Switch off the power to the ZoneControl and ensure that it cannot be unintentionally switched
on again.
Put up signs to indicate that maintenance or cleaning work is being carried out.
¾
7.1

Maintenance

Checking the ZoneControl

The ZoneControl itself requires no maintenance. However, in order to prevent faults from occurring, the connections
and fixings must be examined on a regular basis.
In the course of regular inspection and maintenance work on the conveyor, ensure that the screws of the
¾
ZoneControl are still tight, that the cables are still arranged correctly and that the corresponding connections
are correctly attached.

Replacing the ZoneControl

If a ZoneControl is damaged or defective, it must be replaced.
Do not attempt to open the ZoneControl.
Install a new ZoneControl (see „Abandonment", page 49 and see „Installing the ZoneControl in a conveyor
¾
system", page 24).
44 von 54
Version 2.0 (04/2019) Online
Translation of the original operating manual

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZoneControl and is the answer not in the manual?

Table of Contents