Recurring 110-Hour Inspection - Bell 206L4 Maintenance Manual

Hide thumbs Also See for 206L4:
Table of Contents

Advertisement

BHT-206L4-MM-1
INSPECTION PROCEDURE:
1.
Inspect upper left attachment fitting for cracks, mechanical damage, corrosion damage,
loose rivets, and general condition.
2.
Refer to ASB 206L-09-158 for wear, damage, and repair limits.
3.
Repair fitting in accordance with ASB 206L-09-158.
4.
Replace cracked or damaged fitting or loose rivets in accordance with ASB 206L-09-158.
5.
If a crack is found, contact Product Support Engineering .
Figure 4-1. Tailboom Upper Left Attachment Fitting (206-032-409-001)
4-00-00
Page 12
Rev. 23 25 JUN 2019
(DETAILS OMITTED FOR CLARITY)

— Recurring 110-Hour Inspection

TC APPROVED
206LS_MM_04_0001+_c01
Export Classification C, ECCN EAR99

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

206l

Table of Contents