BHT-206L4-MM-1
5-26.
300-HOUR AIRFRAME PROGRESSIVE INSPECTION — EVENT NO. 6 (CONT)
DATA REFERENCE
Chapter 96
Chapter 53
Chapter 28
Chapter 96
Chapter 67
5-00-00
Page 78
Rev. 13 25 FEB 2011
PROGRESSIVE INSPECTIONS
INSPECTION TASK DESCRIPTION
8.
Verify operation of the baggage door ajar caution light, (if
installed).
FUSELAGE (INTERIOR)
1.
Examine baggage compartment for condition.
2.
Gain access to inside of aft fuselage through access
panels in baggage compartment and access panel located on
the aft right hand fuselage:
a. Examine access panels and fasteners for condition.
b. Examine under engine pan for fuel, oil or water leaks.
c. Examine drain lines for condition and security.
d. Examine interface between longerons and engine pan
structure for cracks, corrosion, distortion and loose fasteners.
e. Inspect
engine
condition.
3.
Remove fuel shutoff valve access panel.
a. Examine structure for cracks and corrosion.
b. Examine fuel system components for leaks and general
condition.
c. Examine wires and connectors for condition.
CONTROLS
1.
Examine the anti-torque control system components for
condition and security.
2.
Examine the stabilizer elevator control system components
for condition and security.
mount
attachment
structure
INITIAL
MECH
OTHER
for