BHT-206L4-MM-1
5-48.
100 HOURS AFTER EACH INSTALLATION (CONT)
DATA REFERENCE
BHT-ALL-SPM
5-00-00
Page 138
Rev. 13 25 FEB 2011
SPECIAL INSPECTIONS
INSPECTION TASK DESCRIPTION
If a nut is improperly torqued, remove and check tare
torque, and replace as required. Recheck torque at
next 100 hours.
2.
Torque check transmission top case stud nuts 130 to 160
inch-pounds (15 to 18 Nm).
3.
Touch up paint finish as required.
NOTE
INITIAL
MECH
OTHER
ECCN EAR99