Figure 32: Removing The Dust Cover From An Sfp Transceiver; Figure 33: Positioning The Sfp Handle In The Upright Position - Allied Telesis AlliedWare Plus GS980M Series Installation Manual

Gigabit ethernet switches
Table of Contents

Advertisement

Chapter 6: Cabling the Networking Ports and Powering On the Switch
74
Figure 32. Removing the Dust Cover from an SFP Transceiver
7. Verify the position of the handle on the transceiver. If the transceiver is
in a top port, the handle should be in the upright position, as shown in
Figure 33. If the transceiver is in a bottom port, the handle should be in
the down position.
SFP Handle
Figure 33. Positioning the SFP Handle in the Upright Position
8. Connect the fiber optic cable to the transceiver, as shown in Figure 34
on page 75. The connector on the cable should fit snugly into the port,
and the tab should lock the connector into place.

Advertisement

Table of Contents
loading

Table of Contents