Installing An Optional Sfp Transceiver; Figure 11. Removing The Dust Plug From The Sfp Slot - Allied Telesis AT-GS950/16 Installation Manual

Gigabit ethernet smart switches
Hide thumbs Also See for AT-GS950/16:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Installing an Optional SFP Transceiver

AT-GA950/16 and AT-GA950/24 Gigabit Ethernet Smart Switches Installation Guide
The AT-GS950/16 and AT-GS950/24 Gigabit Ethernet Smart switches
each have two SFP uplink ports.
To install an SFP transceiver, perform the following procedure:
Note
The transceiver can be hot-swapped; you do not need to power off
the switch to install a transceiver. However, always remove the
cables before removing the transceiver.
Note
You must install the transceiver before you connect cables to it.
1. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
Warning
An SFP transceiver can be damaged by static electricity. Be sure to
observe all standard electrostatic discharge (ESD) precautions,
such as wearing an antistatic wrist strap, to avoid damaging the
transceiver.
2. Remove the dust plug from the SFP slot, as shown in Figure 11.

Figure 11. Removing the Dust Plug from the SFP Slot

3. Locate the label on the transceiver and turn it so that the label is on top
and the alignment groove is on the bottom.
737
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs950/24

Table of Contents