Aumuller KS 15 800 S12 Assembly And Commissioning Instructions

24v dc chain drive for windows

Advertisement

Quick Links

Assembly and Commissioning
Instructions
according to Machinery Directive 2006 / 42 / EC (annex VI)
KS 15 S12 24V DC - C
D
HAIN
RIVE FOR WINDOWS

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the KS 15 800 S12 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Aumuller KS 15 800 S12

  • Page 1 Assembly and Commissioning Instructions according to Machinery Directive 2006 / 42 / EC (annex VI) KS 15 S12 24V DC - C HAIN RIVE FOR WINDOWS...
  • Page 2 ONTENTS Abbreviations Target Groups Warning and Safety Symbols Intended Use 3 - 8 Safety Instructions Data sheet KS 15 S12 24V Explanations on the product label 9 - 10 Areas of application and casement sizes Inspection before the installation NSTALLATION STEP Installation prerequisite and Installation preparation NSTALLATION STEP 12 - 13...
  • Page 3: Target Group

    RELIMINARY REMARK BBREVIATIONS ARNING AND SAFETY SYMBOLS IN THESE Index of abbreviations STRUCTIONS These abbreviations are used consistently throughout these assembly The symbols used in the instructions shall be strictly observed and have & operating instructions. Unless stated differently, all dimensions indi- the following meaning: cated in this document are in mm.
  • Page 4: Preliminary Remark

    RELIMINARY REMARK NTENDED USE Area of application / Scope of application This drive is intended for the electromotive opening and We as manufacturers are well aware of our duties and closing of windows in facade and roof areas. responsibilities regarding the development, manufactu- The main task of this product, in combination with ring and placing of safe window drives on the market and a window and a suitable external control unit, is to...
  • Page 5 RELIMINARY REMARK Hazard analysis according to DIN EN 60335-2-103 NSHEV according to NSHEV according to EN12101-2 with EN12101-2 without Use of the drive dual purpose for ventilation dual purpose for ventilation (1.Z.109) AUTION Natural ventilation Keep people away during closing! Installation height of drive and lower edge of casement: >...
  • Page 6: Safety Instructions

    AFETY INSTRUCTIONS AFETY INSTRUCTIONS It is important to follow these instruc- Installation tions for the safety of persons. These These instructions address expert and safety-conscious ARNING instructions shall be kept in a safe place electricians and / or qualifi ed personnel knowledgeable in for the entire service life of the products.
  • Page 7 AFETY INSTRUCTIONS Crush and shear points All-pole disconnecting devices shall be instal- To avoid injuries, crushing and shear points between led in the permanent electrical installation or casement and frame must be secured against entrapment external Control Unit for the drive. up to an installation height of 2,5 meters above the The mains supply lines 230 V / 400 V AC shall fl oor with appropriate measures.
  • Page 8: Ambient Conditions

    AFETY INSTRUCTIONS Commissioning, operation and maintenance Replacement parts, fasteners and controls After the installation and after each modifi cation in the set The drive shall only be operated with control devices from up all functions shall be checked with a trial run. It shall the same manufacturer.
  • Page 9: Data Sheet

    ORDER DATA s [mm] L [mm] Version Finish PU / pcs. Part.-No. Drives KS 15 800 S12 24V E6/C-0 525380 1000 KS 15 1000 S12 24V E6/C-0 525400 Set: Frame bracket and casement bracket (kit) Set: Frame bracket unit KS 15 Schüco AWS 57 RO...
  • Page 10: Optional Accessories

    ATA SHEET OPTIONS Special model PU / pcs. Part.-No. Drive housing painted/powder coated in other RAL colours Lump sum for coating 516030 1 – 20 516004 21 – 50 516004 Specify at order stage: 51 – 100 516004 from 101 516004 Plug solution: -Click plug solution - 5 m –...
  • Page 11: Roof Window

    REPARING ASSEMBLY REAS OF APPLICATION AND CASEMENT SIZES Areas of application and casement sizes: Roof window FAB min. = L + 100 mm Top-hung casement and bottom-hung casement FAB > 1,80 meter = 2 drives outward opening total weight casement including snow load FAB min.
  • Page 12 REPARING ASSEMBLY 1: I NSTALLATION STEP NSPECTION BEFORE THE INSTALLATION Important instructions for a safe instal- Inspection of the intended use lation. Observe all instructions, wrong The planned use of the drive must be checked for com- ARNING installation may result in serious injury! pliance with its intended use.
  • Page 13: Scope Of Delivery

    SSEMBLY ORBEREITUNGEN 2: I NSTALLATION STEP NSTALLATION PREREQUISITE AND NSTALLATION PREPARATION The following conditions must be fulfi lled for the instal- Check window data on site lation of the drives so they can be properly assembled with • Measure FAB and FAH. other parts and constructed to a complete machine at the •...
  • Page 14: Installation Step

    RAME BRACKETS AND ASEMENT BRACKET 3: F NSTALLATION STEP RAME BRACKETS AND ASEMENT BRACKET CHÜCO AICO Frame brackets (different frame brackets for Schüco and Raico) Frame bracket (Set: Schüco) Frame bracket (Set: Raico)   Frame bracket K153 (for Schüco) Frame bracket K154 (for Raico) ...
  • Page 15: Application Examples

    PPLICATION EXAMPLES PPLICATION EXAMPLES Outward opening roof window - frame mounting - Schüco AWS 57RO F 54 on-site roof connection reference edge K153 KS 15 To increase the profi le statics, equip the window with additi- onal stiffening elements. ~ 61 Outward opening roof window - frame mounting - Top-hung outward opening - frame mounting Raico FRAME+100/120RI...
  • Page 16 OLE LAYOUT FOR RAME BRACKETS AND ASEMENT BRACKETS 4: H NSTALLATION STEP OLE LAYOUT FOR RAME BRACKETS AND ASEMENT BRACKETS Roof window outward opening - hole layout - frame mounting See: 5 - 7 NSTALLATION STEP To increase the profi le statics, equip the window with additional stiffening elements.
  • Page 17 SSEMBLY 5: A NSTALLATION STEP SSEMBLY FRAME BRACKET    Determine fastenings for frame brackets Kxxx  Mout the frame brackets Kxxx - with on-site screwn  Produce drill holes with appropriate cross-section. (M6) - to the frame. Screws - for mounting on the window - are to be provided by the customer! Make sure it is parallel to casement edge.
  • Page 18 SSEMBLY 6: A NSTALLATION STEP SSEMBLY CASEMENT BRACKETS AND THE DRIVE   Determine fastenings for casement brackets F54  Connect control voltage of the drive KS 15 (e.g. using a  Produce drill holes with appropriate cross-section. tester).  Move out the chain of drive KS 15 approx. 100 to Screws - for mounting on the window - are to 150 mm.
  • Page 19 SSEMBLY     Insert the chain-adapter  Insert the two mounting bolts in the fi rst bearing block of the drive KS 15  in the frame brackets Kxxx Insert the mounting bolts in the frame brackets KS 15 ...
  • Page 20: Cable Routing

    ABLE ROUTING 7: C NSTALLATION STEP ABLE ROUTING Cable in the window frame Cable in glued cable duct KS 15 Cable duct KS 15 Glued cable duct Drill hole for cable Ø 9 in the window frame (in addition secured with countersunk screws against (cable bushing protects against damage to cable).
  • Page 21: Electric Connection

    LECTRIC ONNECTION 8: E NSTALLATION STEP LECTRIC ONNECTION Make sure when establishing the connection The running direction of the 24V-drive may be changed that there is no voltage at the terminals! by interchanging (polarity reversal) the wires „BN - Unused wires must be safely insulated! (brown)“...
  • Page 22 LECTRIC ONNECTION M-COM LECTRIC ONNECTION CONFIGURED WITH Multi-drive operation with M-COM and locking drives - star wiring Individual Options: confi guration Programmable special functions and sequence control with locking drive. In multi-drive systems can be used, up to four individual drives and two locking drives. Confi guration is done by M-COM (See Assembly and Com- Locking drive missioning Instructions M-COM).
  • Page 23 LECTRIC ONNECTION AFETY CHECK NSTALLATION STEP NSTALLATION STEP UPPLY LINES OF ONTROL NIT TO THE RIVES AFETY CHECK AND EST RUN Observe current regulations and guidelines e.g. DIN 4102- Check the mounted system for its safety; perform test run 12 regarding the “Fire behavior of building materials- and commissioning.
  • Page 24: Maintenance

    AINTENANCE AND EPAIR ELP IN CASE OF ALFUNCTIONS EPAIRS AND AINTENANCE AND ODIFICATION AINTENANCE Professional repair of a defect drive can only be performed at the To ensure continuous function and safety of the drive periodic maintenan- manufacturer’s factory or manufacturer-certifi ed specialist company. ce by a specialist company is required at least once a year (as mandated Unauthorized opening or manipulation of the drive terminates warranty.
  • Page 25: Disposal / Warranty

    ISPOSAL ARRANTY EMOUNTING ARRANTY AND USTOMER ERVICE The drives are demounted by reversing the steps, as for the installation. In principal apply our: The adjustments are omitted. „General Terms for the Supply of Products and Services of the 1. Completely disconnect the system from the power supply before Electrical Industry (ZVEI)“.
  • Page 26 Assembly Instruction KS 15 S12 24V DC...
  • Page 27: Declaration Of Conformity

    ERTIFICATE AND ECLARATION OF ONFORMITY The proof of the application of a quality management We declare under our sole responsibility that the product system is for company: described under "Data sheet" is in conformity with the GmbH UMÜLLER UMATIC following directives: according to the certifi cation basis DIN EN 9001 as well the "Declaration of Incorporation and Conformity"...
  • Page 28 AUMÜLLER AUMATIC GMBH Tel. +49 8271 8185-0 Gemeindewald 11 Fax +49 8271 8185-250 86672 Thierhaupten info@aumueller-gmbh.de 9000033001_V0.3_KW31/19...

This manual is also suitable for:

Ks 15 1000 s12

Table of Contents