Installation - Siemens SINAMICS S120 Equipment Manual

Chassis liquid cooled power units
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

4.2.5

Installation

Figure 4-6
Lifting lugs
Basic Line Modules are fitted with lifting lugs as standard when shipped. The units can be
lifted from these lugs by a crane and transported from the pallet to the installation location.
A lifting harness with vertical ropes or chains must be used to prevent any risk of damage
to the housing.
Once the Basic Line Modules have been installed, the lifting lugs to the front of the units
must be removed. The lugs should be safely stored for future use.
Chassis Liquid Cooled Power Units
Manual, (GH7), 01/2011, 6SL3097-4AM00-0BP1
Lifting lugs / screw coupling points for mechanical support
WARNING
Line Modules
4.2 Basic Line Modules
97