2.8
First commissioning, control mode vector AC Drive in the booksize
format
The example provided in this section explains all the configuration and parameter settings,
as well as the tests that are required for initial commissioning. Commissioning is carried out
using the STARTER commissioning tool.
Requirements for commissioning
1. The commissioning requirements have been met according to Section 1.1.
2. The check list - Table 1-1 or 1-2 from the Chapter Preparing for commissioning - has
2.8.1

Task

1. A drive unit is to be commissioned (operating mode vector, closed-loop speed control),
Table 2- 14
Designation
Closed-loop control
Control Unit
Operator Panel
Infeed and drive
Power Module
Motor
2. Commissioning is performed using the BOP20.
3. The function keys on the BOP20 must be parameterized so that the ON/OFF signal and
speed settings can be defined via these keys.
Commissioning Manual
Commissioning Manual, (IH1), 01/2011, 6SL3097-4AF00-0BP1

2.8 First commissioning, control mode vector AC Drive in the booksize format

been filled out and the points complied with.
without DRIVE-CLiQ and without speed encoder with the following components:
Component overview
Component
Control Unit 310-2DP
Basic Operator Panel BOP20
Power Module 340
Induction motor
(without DRIVE-CLiQ interface)
Commissioning
Order number
6SL3040-1LA00-0AA0
6SL3055-0AA00-4BAx
6SL3210-1SB14-xxxx
1LA7
105