Siemens SINAMICS S120 Commissioning Manual page 105

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

What to do?
4.3
Ramp-function
generator
4.4
Setpoint
5.
Load parameters to
device
Commissioning Manual
Commissioning Manual, (IH1), 01/2011, 6SL3097-4AF00-0BP1
2.7 First commissioning, vector control mode in the chassis format
How to do it?
Ramp-function generator
p1140 = 1 Ramp-function generator enable
p1141 = 1 Ramp-function generator start
p1142 = 1 Enable setpoint
Specify setpoint
p1001 = 0 Fixed setpoint 1
p1002 = 40 Fixed setpoint 2
p1020 = r0722 Fixed speed setpoint selection
r1024 = p1070 Fixed setpoint active
Connect with target system (go online)
Target device –> Load to target device
Commissioning
Comment
See function diagram [3060]
A setpoint of 0 (0 signal) or 40 (1
signal) is defaulted via digital input
7. This setpoint is then applied to
the main setpoint p1070.
See function diagram [3010]
Position cursor on drive unit and
right-click.
103

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents