2.1 Procedure when commissioning
2.1.1

Safety guidelines

A hazardous voltage will be present in all components for a further five minutes after the
system has been shutdown.
Note the information on the component!
A project with Safety Integrated can be generated offline; an acceptance test must be
carried out when commissioning, which is only possible online.
Note
The design guidelines and safety information in the Equipment Manuals must be carefully
observed (refer to the documentation SINAMICS S120, Equipment Manual GH1).
CAUTION
In STARTER, after the changeover of the axis type via p9302/p9502 and subsequent
POWER ON, the units that depend on the axis type are only updated after a project upload.