Control Unit 320-2Dp In Operation - Siemens SINAMICS S120 Commissioning Manual

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

3.1.1.3

Control Unit 320-2DP in operation

Table 3- 4
Control Unit CU320-2 DP – Description of the LEDs after booting
LED
Color
RDY (READY)
-
Green
Red
Red/
green
Orange
Green /
orange
or
red /
orange
Commissioning Manual
Commissioning Manual, (IH1), 01/2011, 6SL3097-4AF00-0BP1
State
OFF
Electronic power supply is missing or outside
permissible tolerance range.
Continuous
The component is ready for operation and cyclic
light
DRIVE-CLiQ communication is taking place.
Flashing
Commissioning / reset
light
0.5 Hz
Flashing
Writing to the memory card
light
2 Hz
Flashing
General errors
light
2 Hz
Flashing
Control Unit is ready for operation.
light
However there are no software licenses.
0.5 Hz
Flashing
Updating the firmware of the DRIVE-CLiQ
light
components
0.5 Hz
Flashing
DRIVE-CLiQ component firmware update
light
complete. Wait for POWER ON for the
2 Hz
components in question.
Flashing
Component detection via LED is activated
light
(p0124[0]).
2 Hz
Note:
Both options depend on the LED state when
component detection is activated via
p0124[0] = 1.
Description, cause
Diagnostics
3.1 Diagnostics via LEDs
Remedy
Check power supply
Check
parameterization/configuratio
n data
Obtain licenses
Turn POWER ON for the
components in question
161

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents