Unit Tests; Hardware Test - Mitsubishi Electric QJ71MT91 User Manual

Modbus/tcp interface module
Table of Contents

Advertisement

6
PRE-OPERATIONAL PROCEDURES AND SETTING

6.5 Unit Tests

6.5.1 Hardware test

6 - 8
This section explains the unit tests conducted to check the send/receive functions and
hardware of the QJ71MT91.
The unit tests can be run by changing the intelligent function module switch setting of
the QJ71MT91 (Refer to Section 6.6).
The RAM and ROM of the QJ71MT91 are tested in the following steps.
The test result can be checked with the LEDs on the front of the QJ71MT91.
Step
STOP the programmable controller CPU.
1
Disconnect the network cable from the QJ71MT91.
In the intelligent function module switch setting of GX
2
Developer, set Switch 1 to 000D
test mode. (Refer to Section 6.6.)
3
Reset the programmable controller CPU. (Test start)
After 5 seconds, check the status of each
4
LED.
When the hardware test is completed, change the
5
operation mode to "Online" or another mode in the
intelligent function module switch setting.
6
Reset the programmable controller CPU.
: A possible cause of error is the RAM/ROM fault of the QJ71MT91.
When an error occurs, the error code is stored into the error log area (address: CFE
DFF
) of the buffer memory in the QJ71MT91.
H
Using GX Developer, confirm the error code and take corrective action.
(Refer to Section 11.2 and 11.3.)
POINT
When the hardware test results in an error, check the mounting status of the
module and run the test again.
If the error occurs again, its possible cause is the hardware fault of the QJ71MT91.
Please consult your local Mitsubishi representative.
Operation
to select the hardware
H
Normal
Error
MELSEC-Q
LED Status
[RUN]
[OPEN] [ERR.]
: ON
: OFF
to
H
6 - 8