Chapter 6 Operation Regulation - Contec ECG 100G User Manual

1 channel with monitor
Table of Contents

Advertisement

User Manual

Chapter 6 Operation Regulation

6.1 You are required to read the operation regulation so as to ensure taking proper operation of
the instrument.
6.2 Installation and maintenance of the instrument shall be carried out as the following:
6.2.1 There shouldn't have high voltage cable, X radial engine, ultrasound instruments and
electrotherapeutics engine around the ECG.
6.2.2 Do not install the instrument in the place where it might be affected by bad humidity and
ventilation, direct sunlight, as well as air containing dust, salt, and sulphur, etc.
6.3 The device should be placed in evenness ,and move gently, and should avoid the strong
vibration and impact.
6.4 AC frequency and voltage value should be accorded with the need and the current capacity
should be enough..
6.5 Do the instrument grounding properly during installation. Don't put the patients and the lead
which connect with patients contact with other conductors, including the ground or the sickbed
which ground properly.
6.6 Please ensure the device operated in the range of environment temperature: 5℃~35℃. If
the device is reserved in higher temperature or lower temperature environments, please wait for
about 10 minutes before using it, to ensure normal operation of the device.
9

Advertisement

Table of Contents
loading

Table of Contents