REMKO KWL (H)
Installation instructions for qualified personnel
Important information
before installing
Observe the manuals for the
■
cold water user (indoor units)
and chiller or heating system
when installing the entire
system.
The interior units user and the
■
chiller work independently. A
connection between the two is
not necessary.
Transport the unit in its original
■
packaging as close as possible
to the installation location.
This avoids transportation
damage.
The units may only be moved
■
as installed (upright) using
appropriate transport gear
(Figure 1).
Secure against tipping!
The unit must be kept upright
■
when transporting to a higher
elevation (Figure 2).
Check that the packaged
■
contents are complete and
inspect the unit for any visible
signs of transportation damage.
Report any damage
immediately to your contracting
party and the shipping
company.
Select an installation location
■
which allows air to freely
flow through the intake and
outlet. See section "Minimum
clearances".
Do not install the unit in the
■
immediate vicinity of devices
with intensive thermal radiation.
Installation near thermal radiation
reduces the unit output.
18
Lift the unit only at intended
■
lifting points. Never stress the
medium or refrigerant piping.
The medium connection lines,
■
valves and connections must
be insulated against vapour
diffusion. If necessary, also
insulate the condensate line
(only units with HP-function).
In dual systems with cooling
and heating modes, the
requirements of the current
Energy-Savings-Ordinance
(EnEV) are to be complied with.
Seal off open lines against dirt
■
and never kink or crimp the
lines.
Avoid unnecessary bending.
■
Establish all electrical
■
connections connections in
accordance with the relevant
DIN- and VDE standards.
Always fasten electric wiring
■
properly to the terminals,
otherwise there is a risk of fire.
Comply with all regulations
■
governing structural and
building requirements and
conditions with regard to the
installation site.
1
Correct way to move
In the selection of the
■
installation site, pay attention
to the site itself and to any
possible acoustic reflection from
surrounding units.
To avoid the transmission of
■
vibrations to the installation
site, the units must be installed
on vibration absorbing material
or on vibration decoupled
foundations.
In doing so, make sure that
the lines are also vibration
decoupled.
If the installation site must
■
fulfil special sound emission
requirements, these must
be realised on-site when
appropriate adjustments can be
made.
In these cases, please consult an
appropriate acoustics expert.
2
Correct way to lift
Lifting point