Assembly
Carefully unpack all components. Two people are required, because some parts of your exercise machine are
bulky and heavy. Check that you have all of the fastening material (screws, nuts, etc.) and the components be-
fore starting the assembly steps. Take great care with the installation as damage or defects caused by assembly
errors are not covered by the warranty or guarantee under any circumstances. Please, read the manual before
carrying out the installation, follow the sequence of the installation steps exactly and follow the instructions of
the individual assembly steps. The installation of the exercise equipment must be carried out by responsible
adults. Perform the installation of your exercise equipment in a location that is level, clean and free from ob-
struction during assembly. Carry out the assembly with two people. Only start training after complete installation
of your training device has been carried out.
Preparation of the assembly
Unpack the main frame (A) and place it in your chosen assembly area. This should be level and clean.
ATTENTION: Do not remove the transport safety strap (P) until you have read the assembly instructions. Pre-
mature removal of the conveyor belt (P) can cause the tread to open upwards suddenly.
A
P
Step 1 - Mounting the side frames:
Fold up the left side frame (A06).
Secure it laterally to the main frame with two Allen screws M8x15 (E13) and two locking washers M8 (E32) and
from above with a hexagon socket screw M8x15 (E13) and a pulley M8 (E32).
ENG
Then do the same with the right side frame (A07).
A07
A06
E13
E32
E13
E32
E13
E32
A
P
E32
E13
5
Need help?
Do you have a question about the RunMaxx 6.3 and is the answer not in the manual?
Questions and answers