Equipment Installation; The Installation Of The Extruder - Famsun Muyang SJPS215 Operation Manual

Single-screw extruder
Table of Contents

Advertisement

② If a packing case is not used, take water-proof protection and prevent the goods from collision and
overturn of the equipment during transport.
③ If a packing case is used, fix the complete machine and accessories securely in the case and leave
certain clearances away from the boards of the packing case, so as to avoid collision and damage in
transport. If the height is in excess of the standard, use partial packing in sections.
④ During transportation, protect machine body from overturn, heavy loads or collision.
⑤ The equipment can be packed in a container for transportation.
(3)Inspection
①When the machine arrives at the destination, unpack it and check careful if there is any sign like
collision or rubbing by the transportation.
②Check the documents and accessories against the packing list, and take a record well.
(4)Storage
①If the machine equipment is to be stored in an open air, the facilities for prevention of rain, sunshine and
water accumulation should be available. When the machine equipment is to be stored indoors, make
storage facilities well ventilated and damp proof.
② Store the equipment in ventilated, dry and cool place for long-time storage with damp proof measures.
Cover the exposed surfaces without painting with rust-proof oil.

4.2 Equipment installation

4.2.1 The installation of the extruder

The machine is generally delivered as a complete set. First check if there is any damage during
transportation when unpacking. Before installation, check against the installation dimensions in scaled
drawing of SJPS215B Extruder for enough space on jobsite, especially enough space for operation,
maintenance, and parts replacement. Refer to Fig.4-6 for the space requirements.
To ensure smooth operation, the foundation for extruder installation shall be solid and level. For the
load calculation on the foundation, see Table4-1 Weight of the extruder. Meanwhile, bin weight and
material weight above the feeder as well as live loads of entire set shall be considered in the calculation.
Connect the extruder base to the foundation by expansion screws or pre-embedded anchor bolts
(see Fig.4-5). The specification of the bolts or screws should be M20 or larger in quantity of sixteen.
Installation positions for bolts refer to Fig.4-6, where 10×Φ22mm and 6×Φ26mm holes are for
connections between base and foundation.
Fig.4-5 Pre-embedding of anchor bolts
28

Advertisement

Table of Contents
loading

Table of Contents