Programming Unit - Wolf CGB-2 Series Installation Instructions For Contractors

Wall mounted gas condensing boiler/gas condensing combi boiler
Hide thumbs Also See for CGB-2 Series:
Table of Contents

Advertisement

BM-2 overview
Quick start keys
Key 1
Key 2
Key 3
Key 4
Key 1
Key 2
Key 3
Key 4
38
22. BM-2 programming unit
Note:
Further functions and descriptions can be found in the installation
instructions for contractors or the user operating instructions for the
BM-2 programming unit.
Operating mode
Screen header
Burner status
Boiler
Heating mode
Burner ON
1 x
25.2
°C
Boiler water tem-
perature
14:12
Time
(on this screen – no function)
1x hot water
1 x
Enable emissions test mode
(for flue gas inspector only)
(on this screen – no function)
Status display
1.5
bar
Pressure
20.01.15
Date
eBUS connection available
eBUS connection not available
Rotary selector with
pushbutton function
System data display
(content varies)
3064810_201804

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents