Installation; Cgb-2(K) - Wolf CGB-2 Series Installation Instructions For Contractors

Wall mounted gas condensing boiler/gas condensing combi boiler
Hide thumbs Also See for CGB-2 Series:
Table of Contents

Advertisement

Supply lines on unfinished walls
If supply lines for cold water and DHW, heating, gas and safety
valve drain are routed on unfinished walls, the connections
can be determined using the installation template for unfin-
ished walls.
Route pipes for gas, heating and DHW on unfinished walls ac-
cording to the installation template available as an accessory.
If supply lines for cold water and DHW, heating, gas and safe-
ty valve drain are routed on unfinished walls, the concealed
mounting bracket (accessory) can determine the location of
connections.
Supply lines for surface mounting on finished
walls
If supply lines for cold water and DHW, heating, gas and safety
valve drain are routed on finished walls, the surface mounted
connection bracket (accessory) can be used to determine the
location of connections.
3064810_201804

11. Installation

Fig: Installation template for unfinished walls
Fig: Bracket for unfinished walls (accessory) for CGB-2K
Fig: Bracket for unfinished walls (accessory) for CGB-2
Fig: Connection bracket for surface mounting (accessory)
for CGB-2
Fig: Connection bracket for surface mounting (accessory)
for CGB-2K
Seite 15
Bild: Montageschablone Unterputz
Seite 15
Bild: Montageschablone Unterputz
Bild: Rohbaukonsole Unterputz (Zubehör) für: CGB-K, CGB mit FSW-120
Bild: Rohbaukonsole Unterputz (Zubehör) für: CGB-K, CGB mit FSW-120
Bild: Rohbaukonsole Unterputz (Zubehör)
Bild: Anschlusskonsole für Überputzausführung (Zubehör) für:
Gasthermen CGB
Bild: Anschlusskonsole für Überputzausführung (Zubehör) für:
Gaskombithermen CGB-K
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents