Am Display Module - Wolf CGB-2 Series Installation Instructions For Contractors

Wall mounted gas condensing boiler/gas condensing combi boiler
Hide thumbs Also See for CGB-2 Series:
Table of Contents

Advertisement

AM overview
Quick start keys
Key 1
Key 2
Key 3
Key 4
Key 1
Key 2
Key 3
Key 4
3064810_201804
19. AM display module
Note:
If your Wolf boiler is not equipped with an AM display module, ignore
this page.
Further functions and descriptions can be found in the installation
instructions for contractors or the user operating instructions for the
AM display module.
Status display
Operating mode
Heating mode
Burner status
ON
Burner ON
Boiler pump ON
Set boiler temperature
(if BM-2 used as remote control – no function)
Set DHW temperature
(if BM-2 as remote control – no function)
Enable emissions test mode
(for flue gas inspector only)
Acknowledge fault/End/Back
Status
Boiler in heating mode
Rotary selector with
pushbutton function
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents