Operating And Maintaining Your Shade; Before Proceeding - Screen Innovations Zen Box Owner's Manual

With shyzip tracks and cable guide
Table of Contents

Advertisement

OPERATING AND MAINTAINING YOUR SHADE

• Operation of the shade systems should only be completed by qualified person(s)
• Always monitor the operation of the Shade Systems to ensure proper operation and that furniture
or other obstacles cannot prevent normal deployment or retraction of the shade system
• DO NOT lower shade during high wind conditions (gusts over 20 mph). Doing so will result in
damage that will need to be repaired by a qualified technician. If the shade system is currently
in the down position, it is usually okay to operate the shade and retract it� However, avoiding
operation at any time when High Wind conditions are present is considered proper operation�
• For Shyzip - Side Track maintenance is important to ensure proper operation and trouble free
performance of the Zipper and ShyZip® track system� It is recommended that an annual or bi-
annual cleaning of the side tracks be performed by clearing any debris and/or dirt/dust that has
built up in the track housing and zipper inserts� A light power washing and/or utilizing a air blower
to "blow the debris" out of the tracks� A periodic light spraying of the food based Silicone after said
maintenance may be necessary or preferred during this maintenance operation to ensure a smooth
and proper operation of the zipper track system but is not considered to provide any smoother
operation over time because it typically only lasts outdoors for 2-3 weeks�
Operating and maintaining your shade

BEFORE PROCEEDING

Read the instructions in their entirety before proceeding. Actions contrary to the
instructions invalidate the warranty and may result in serious damage and/or injury.
Preparing for your installation: It is crucial that all installations are planned out carefully
before specifying a shade order.
For new construction or difficult installations it is advised to order and install the tracks first. Then
take the measurement outside of track to outside of track, when possible, to specify your shade
width.
If pre-installing tracks; make sure that tracks are sealed from construction materials during
construction.
Measure the opening carefully and make sure that the correct width shade is ordered�
Make sure that the tracks and the shade boxes can all be installed securely level and plumb� Add
appropriate blocking or carpentry work before installing tracks and shades�
SI will not cover any warranty on systems that are installed without original brackets� Warranty will
be null & void if installation is performed by drilling directly through the box, both on ceiling and
wall mount�
Electrical work should be performed using appropriate electrical codes and regulation, by a
licensed electrical professional�
Specify fasteners appropriate for the location the tracks and shade boxes will be mounted to�
Before removing the screen from the packaging, check for damage and to make sure all parts are
included�
Do not use any sharp blades when opening the screen packaging� Open by hand�
Care in mounting and correct operation will result in long and satisfactory service from the SI
screen�
Make sure to acquire appropriate mounting hardware for your installation as mounting hardware is
not provided due to the need for the installer to identify mounting surface requirements�
Pg 1
Before proceeding
Pg 2

Advertisement

Table of Contents
loading

Table of Contents