Screen Innovations Zen Box Owner's Manual page 12

With shyzip tracks and cable guide
Table of Contents

Advertisement

INSTALLING THE TENSIONERS AND
CUTTING CABLES -
3
Install the tensioners onto the mounts making sure that they are threaded out as much as possible
so that there will be thread available to tension the cables. Cut the cables such that they are the
same length so that they will just extend to the bottom of the hole in the tensioner.
Cut Here
Zen Box - Cable - Installing the tensioners and cutting cables
TENSIONING THE GUIDE CABLES -
Insert the cable into the tensioner all the way to the bottom of the tensioner and secure with the
set screws. Then tension the cable by tightening the nut for wall mount brackets or the tensioner
itself for floor mount. Finally lock in the tensioners with the locknut. Make sure that the cables
are mounted level and plumb in all directions. As a final check make sure that the left and right
cables are the same distance apart from top to bottom within 1/4''.
NOTE: Cables may lose tension over time. In that case simply
tighten the tensioners and lock in with the lock nut.
Pg 19
Zen Box - Cable - Tensioning the guide cables
4
Insert cable and bottom out
4A
into the tensioners
Secure with
4B
set screws
Turn bottom nut to
4C
tension cable
Pg 20

Advertisement

Table of Contents
loading

Table of Contents