Hydraulic System Maintenance; Preliminary Information - PRONAR PT610 Operator's Manual

Agricultural trailer
Table of Contents

Advertisement

SECTION 5
Check tightness of connections in accordance with Chapter (5.3.2).
FIGURE 5.10
Installation of pneumatic conduit
(1) pneumatic conduit, (2) connecting nut (3) clamping ring, (4) reinforcing sleeve

5.4 HYDRAULIC SYSTEM MAINTENANCE

5.4.1

PRELIMINARY INFORMATION

Work connected with the repair, change or regeneration of hydraulic system components
(tipping cylinder, valves etc.) should be entrusted to specialist establishments, having the
appropriate technology and qualifications for this type of work.
The duties of the operator connected with the hydraulic system maintenance include:
• checking tightness and visual inspection of the system,
• checking technical condition of hydraulic connections.
Reinforcing sleeve (4) of the conduit must be thoroughly depressed.
5.23
Pronar PT610

Advertisement

Table of Contents
loading

Table of Contents