______________________________________________________________________ - Alpha ESS T100 Installation & Operation Manual

Energy storage system (ess)
Table of Contents

Advertisement

and parallel
connection
Check the
Module
module for
grounding
correct
grounding
Check the
terminals of
Module
modules for
terminal
insulation
protection
Check the on-off
function and
Circuit
tripping function
breaker
of circuit
breakers
PCS
Check the PCS
display
screen
Check inside
temperature of
PCS inside
PCS, including
temperatur
module
e
temperature and
cabinet
temperature
Check the
terminals of
PCS cable
PCS cables for
overheat marks
Check the PCS
PCS
for correct
grounding
grounding
Check the
PCS fixing
fixings of PCS
with container

______________________________________________________________________

tight
The bolts on
module surface
should be
electrically
Once 6
connected to the
months
bracket surface and
grounding
bars(tested by a
multimeter)
All red and black
covers should be
Once 6
complete
months
The circuit breaker
function should be
Once 6
OK; When breaker
months
is off , no voltage is
allowed
All data on PCS
Once 6
including voltage,
months
power and current
is OK
No alarming events
on PCS
Once 6
months
No overheating
Once 6
marks or burning
months
marks
No rusting or
Once 6
damage
months
All fixing bolts
Once 6
should be tight
months
Alpha ESS Co., Ltd.
Your Smart Energy
Wrenches;
Insulated gloves
Work cloth;
Protective shoes;
Wrenches;
Insulated gloves
Work cloth;
Protective shoes;
Wrenches;
Insulated gloves
Work cloth;
Protective shoes;
Wrenches;
Insulated gloves
Work cloth;
Protective shoes;
Work cloth;
Protective shoes;
Work cloth;
Protective shoes;
Work cloth;
Protective shoes;
Work cloth;
Protective shoes;
Wrenches;
Insulated gloves
Page 37 of 45