7.0 MAINTENANCE
WARNING: ALWAYS CLEAN YOUR BOOM AT THE END OF THE
WORK DAY OR BEFORE SERVICING IS DONE TO AVOID
UNNECESSARY CONTACT WITH CHEMICALS!
7.1 Lubrication
Lubrication of the boom daily will ensure maximum performance and life.
This lubrication includes the center frame, as well as the boom hinges and
breakaway clutches.
7.2 Greasing the Center Frame
Every 8 hours (daily) new grease should be applied to the wear surfaces
on the center frame (Fig. 21).
Every 50 hours the grease on the center frame should be completely
cleaned off with a degreasing solvent and new grease applied. Follow the
above steps when doing this.
Fig. 21
7.3 Greasing The Suspension/Pivot Linkage
Every 8 hours the places indicated in the following pictures should be
greased.
HARDI
®
EAGLE 3PT BOOM OPERATORS MANUAL
41