Test Voltage - Siemens SITOP PSU8200 3ph Manual

Table of Contents

Advertisement

Safety, approvals, EMC

7.2 Test voltage

7.2
Test voltage
Figure 7-1
Only the manufacturer can perform the type test and production test; users can also perform
the field test.
Preconditions for performing the field test:
Tests (A) & (B)
● Connect the input terminals with one another
● Connect the output terminals, signaling contact and PE with one another
Test (C)
● Connect the output terminals and signaling contact with one another and measure with
respect to PE
Table 7- 1
Test voltage for 6EP3436-8SB00-0AY0
Type test
Production test
Field test
Note:
Tripping current for DC measurement: 0 mA
Tripping current for AC measurement: <100 mA
40
Test voltage diagram
Test time
Prim ↔ sec (A)
60 s
4200 VDC
60 s
3000 VAC
1 s
4200 VDC
1 s
3000 VAC
1 s
2200 VDC
1 s
1500 VAC
Prim ↔ PE (B)
Sec ↔ PE (C)
2200 VDC
700 VDC
1500 VAC
500 VAC
4200 VDC
500 VDC
3000 VAC
350 VAC
2200 VDC
500 VDC
1500 VAC
350 VAC
Manual, 11.2014, C98130-A7638-A1-2-7629
SITOP PSU8200 3ph

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6ep1437-3ba10Sitop psu8200 24 v/20aSitop psu8200 24 v/40a6ep3436-8sb00-0ay0

Table of Contents