Test Voltage - Siemens SITOP PSU6200 3ph Equipment Manual

Table of Contents

Advertisement

Safety, approvals, EMC

7.2 Test voltage

7.2
Test voltage
Figure 7-1
Only the manufacturer can perform the type test and production test; users can also perform
the field test.
Preconditions for performing the field test:
Test (A)
● Connect input terminals (L1, L2, L3) with one another, connect output terminals and
signaling contact with one another – and measure with respect to one another
Test (B)
● Connect input terminals (L1, L2, L3) with one another, and measure with respect to PE
Test (C)
● Connect the output terminals and signaling contact with one another and measure with
respect to PE
Table 7- 1
Test voltage
Type test
Production test
Field test
Remark:
Tripping current for DC measurement: max. 10 mA
50
Test voltage diagram
Test time
Prim ↔ sec (A)
60 s
4200 V DC
1 s
4200 V DC
1 s
4200 V DC
Prim ↔ PE (B)
Sec ↔ PE (C)
3350 V DC
850 V DC
3350 V DC
850 V DC
3350 V DC
850 V DC
Equipment Manual, 02.2020, A5E44623402-1-76
SITOP PSU6200 3ph

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sitop psu6200 24v/5aSitop psu6200 24v/10aSitop psu6200 24v/20a6ep3433-7sb00-0ax06ep3434-7sb00-3ax06ep3436-7sb00-3ax0

Table of Contents