Section 3: Setup; Needed For Setup - Grizzly G0886 Owner's Manual

12'' x 14'' 3 hp auto metal-cutting bandsaw
Table of Contents

Advertisement

This
serious
to untrained users. Read
through this entire manu-
al to become familiar with
the controls and opera-
tions before starting the
machine!
Wear safety glasses during
the entire setup process!
This is an extremely heavy machine! Serious
personal injury or death may occur if safe
lifting and moving methods are not fol-
lowed. To be safe, you will need assistance
and power lifting equipment when moving
shipping crate and removing machine from
crate. Seek assistance from a professional
rigger if you are unsure about your abili-
ties or maximum load ratings of your lifting
equipment.
Model G0886 (Mfd. Since 01/19)

SECTION 3: SETUP

machine
presents
injury
hazards

Needed for Setup

The following are needed to complete the setup
process:
For Lifting and Moving:
— Two additional people
— A forklift or other power lifting equipment
rated for at least 2250 lbs.
— Four lifting straps rated for at least
2250 lbs. each
— Four heavy-duty lifting hooks or shackles
rated for at least 2250 lbs.
For Power Connection:
— A power source that meets minimum
circuit requirements for machine (review
Power Supply on Page 11 for details)
— An electrician or qualified service person-
nel to ensure a safe and code-compliant
connection to power source
For Assembly:
— Safety glasses for each person
— Leather gloves for each person
— Disposable Shop Rags
— Cleaner/degreaser (see Page 16)
— Quality metal protectant/lubricant
— Hammer & Pry Bar
— Open-End or Socket Wrench 14mm
— Hex Wrench 5mm
— Piece of metal stock
-13-

Advertisement

Table of Contents
loading

Table of Contents