Five-Rack Configuration - Hitachi G1500 Hardware Manual

Virtual storage platform
Hide thumbs Also See for G1500:
Table of Contents

Advertisement

Floor Load
Rating
(kg/m2)
350
300
Notes:
1. Actual clearances for installation should be determined after consulting with the
construction specialist responsible for installations in the building. Clearances can
vary depending on the size/layout of the system and building conditions.
2. When various configurations of storage systems are arranged in a row, clearance
values based on the largest storage system configuration should be used.
3. For easier maintenance operations, make clearance (c) as large as possible.

Five-rack configuration

The following figure shows the service clearances for a five-rack configuration.
Hitachi Virtual Storage Platform G1000, G1500, and VSP F1500 Hardware Guide
Required Clearance (a+b) m
c= -0.3
c=0
c=0.2
2.9
2.3
1.9
4.4
3.6
3.2
Chapter 4: Site preparation specifications
Five-rack configuration
c=0.4
c=0.6
c=0.8
1.6
1.4
1.2
2.8
2.5
2.2
c=1.0
c=1.4
0.9
0.6
1.9
1.5
97