Three-Rack, Dual-Controller Configuration - Hitachi G1500 Hardware Manual

Virtual storage platform
Hide thumbs Also See for G1500:
Table of Contents

Advertisement

Floor load
rating (kg/m2)
450
400
350
300
Notes:
1. Actual clearances for installation should be determined after consulting with the
construction specialist responsible for installations in the building. Clearances can
vary depending on the size/layout of the system and building conditions.
2. When various configurations of storage systems are arranged in a row, clearance
values based on the largest storage system configuration should be used.
3. For easier maintenance operations, make clearance (c) as large as possible.

Three-rack, dual-controller configuration

The following figure shows the service clearances for a three-rack configuration with two
controllers.
Hitachi Virtual Storage Platform G1000, G1500, and VSP F1500 Hardware Guide
Required clearance (a+b) m
c= -0.3
c=0
c=0.2
0.9
0.5
0.4
1.3
1.0
0.8
2.0
1.6
1.3
3.1
2.6
2.2
Chapter 4: Site preparation specifications
Three-rack, dual-controller configuration
c=0.4
c=0.6
c=0.8
0.2
0.1
0
0.6
0.4
0.3
1.1
0.9
0.8
2.0
1.7
1.5
c=1.0
c=1.4
0
0
0.2
0
0.6
0.4
1.3
1.0
91

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F1500G1000

Table of Contents