Chapter 5: Cable connection guidelines
Observe the following guidelines when configuring host port connections and connecting
power or data cables to VSP G1000, VSP G1500, and VSP F1500 storage systems.
Port configurations
The following figures show the front-end director port configurations.
Figure 23 Front-end director 16-port configuration
Figure 24 Front-end director 8-port configuration
Hitachi Virtual Storage Platform G1000, G1500, and VSP F1500 Hardware Guide
Chapter 5: Cable connection guidelines