Four-Rack Configuration - Two Controllers (Center) - Hitachi G1500 Hardware Manual

Virtual storage platform
Hide thumbs Also See for G1500:
Table of Contents

Advertisement

Floor Load
Rating
(kg/m2)
350
300
Notes:
1. Actual clearances for installation should be determined after consulting with the
construction specialist responsible for installations in the building. Clearances can
vary depending on the size/layout of the system and building conditions.
2. When various configurations of storage systems are arranged in a row, clearance
values based on the largest storage system configuration should be used.
3. For easier maintenance operations, make clearance (c) as large as possible.

Four-rack configuration - two controllers (center)

The following figure shows the service clearances for a four-rack, two-controller
configuration, with the controllers in the center two racks.
Hitachi Virtual Storage Platform G1000, G1500, and VSP F1500 Hardware Guide
Required Clearance (a+b) m
c= -0.3
c=0
c=0.2
2.3
1.8
1.6
3.5
2.9
2.5
Chapter 4: Site preparation specifications
Four-rack configuration - two controllers (center)
c=0.4
c=0.6
c=0.8
1.3
1.1
1.0
2.2
2.0
1.8
c=1.0
c=1.4
0.8
0.5
1.6
1.2
93