Quick installation checklist

This checklist provides a high-level overview of the basic installation process from the planning stage to
the point where the device comes online and is ready to be deployed. Completing all the tasks in the
suggested order ensures successful installation. Brocade recommends that you print this checklist and
take it to the installation site.
Pre-installation tasks
Review all installation requirements ahead of time as part of your site preparation. Careful planning and
site preparation ensures seamless installation, especially when installing multiple devices.
Table 6. Installation prerequisites
Task
Unpack the device.
Gather necessary components and
required tools.
Review the safety precautions.
Plan the installation.
Review and verify installation
requirements.
Gather network configuration
parameters.
Installation and initial configuration
The initial setup includes mounting the device on a flat surface or in a rack and completing the
configuration tasks necessary to bring the device online and verify the operation.
10
SAN128B-6 Installation, Service, and User Guide
Task details or additional information
Take an inventory of the hardware components included in your
shipment. Refer to "Shipping carton contents" on page 12.
Review the time and items required information at the beginning of
each chapter to ensure you have gathered all necessary components
required for the following installation tasks:
v "Mounting the switch" on page 13
v "Power Supply Assemblies" on page 57
v "Fan Assemblies" on page 65
v "Installing Transceivers and Cables" on page 45
Refer to "Safety precautions" on page 5. For translations, refer to
"Cautions" on page xi at the end of this guide.
Decide whether you want to install the unit on a flat surface or in a
rack. For rack installation, obtain the appropriate rack mount kit.
Refer to "Mounting the switch" on page 13.
Verify that the following requirements are met. Refer to "Facility
requirements" on page 9.
v Power requirements
v Environmental requirements
v Clearance for standalone or rack installation
v IP address:
v Subnet mask:
v Default gateway:
v Domain ID:
v Time zone:
Completed

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8960-f968960-n96

Table of Contents