Getting Started
STEP 4. Install the P937xA Network Analyzers
Installation Procedure
Position the P937xA to provide ample space between the chassis fan
intake and exhaust vents. Blockage by walls or obstructions affects the air
flow needed for cooling. (Refer to
chassis
cooling.)
IMPORTANT!
If you are using a multiport (stacked) configuration ensure you have the
correct master P937xA assigned. Refer to,
https://www.keysight.com/find/usb-vna
model > Resource Center > Manuals > USB VNA Help File and search for
the "Multiport and Multisite Configuration" topic (you will need to save the
file to your desktop to view the files)). See also, USB Chassis Soft Front
Panel Help File.
This procedure assumes you have Option Y1701A latch keys and jumpers kit.
Learn more, refer to,
1. If using only one P937xA module, leave the 50 ohm loads attached as
shown in
Figure 1-3
Single P937xA Network Analyzer Module Configuration
In the following instructions, two P937xA network analyzer modules are
configured. Use these instructions as a general guide if installing a
different number of modules.
2. As seen in
50 ohm loads attached to each module. To enable connections between
P937xAs, some of these loads must be removed. To remove the loads, use
the socket adapter, seen in
(0.91 N.m) torque driver.
1-12
"Space Requirements" on page 12
"Hardware Requirements" on page
Figure 1-3 on page
Figure 1-4 on page
a. On the first P937xA, remove the 50 ohm load from the LO Out port.
Leave the load installed on the LO In port.
Figure 1-2 on page 11
for more information about
(i.e., click on your USB-VNA
12.
13, each module is shipped with two
Figure 1-5 on page
13, attached to the 8 lbf-in
Keysight Technologies Startup Guide
and to the P937xA
8.