Reset Button; Idu Installation; Table 2-4: Cpe-Idu-1D Connectors; Table 2-5: Cpe-Idu-1D Leds - Alvarion BreezeMAX PRO-S CPE Product Manual

Table of Contents

Advertisement

Name
ETHERNET (4)
(on the side panel)
RADIO
(on the front panel)
POWER
(on the bottom panel)
Name
Description
POWER (3)
Power Indication
ETH (2)
Ethernet link status
(Ethernet integrity)
WIRELESS (1)
Wireless link status
* After power-up, the WIRELESS LED illuminates until self-test is finished.
2.2.4

RESET Button

The recessed RESET button is located on the front panel of the unit. When
pressed, power to the ODU is disconnected (hard reset).
2.2.5

IDU Installation

To install the IDU:
BreezeMAX CPEs Product Manual

Table 2-4: CPE-IDU-1D Connectors

Connector
10/100Base-T (RJ-45) with 2
embedded LEDs
10/100Base-T (RJ-45)
3-pin AC

Table 2-5: CPE-IDU-1D LEDs

Functionality
Installing the IDU-1D Indoor Unit of the PRO-S CPE
Functionality
Connection to the user's LAN/PC
Cable connection to a hub/switch/router: Crossed
Cable connection to a PC: Straight
Connection to the ODU
Mains power connection
Off - IDU is not powered or power failed
Green - IDU power is OK
Off - No Ethernet connectivity has been detected between
the outdoor unit and the device connected to the indoor
unit's data port
Green - Ethernet connectivity has been detected between
the outdoor unit and the device connected to the indoor
unit's data port
Off - SU is not associated with a Base Station
Green - SU is connected with a Base Station (network
entry completed)
Blinking Green - Authentication failed
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Breezemax si cpe

Table of Contents