Alvarion BreezeMAX PRO-S CPE Product Manual page 50

Table of Contents

Advertisement

Chapter 2 - Installation
Connect one end of the coaxial RF cable to the RF connector (marked
1
located on the bottom panel of the unit.
Connect the other end of the RF cable to the antenna.
2
The RF connectors should be properly sealed to protect against rain and
3
moisture.
2.1.6.3
Connecting the IDU-ODU Cable
CAUTION
Use only Category 5E 4x2x24# FTP outdoor cables from an approved manufacturer. See list of
approved cables in
meters. The length of the Indoor-to-Outdoor cable, together with the length of the Ethernet cable
connecting the CPE-IDU-1D to the data equipment, should not exceed 100 meters.
To prepare the IDU-ODU cable:
Use a crimp tool for RJ-45 connectors to prepare the wires. Insert them into the
appropriate pins and use the tool to crimp the connector. Make sure to do the
following:
Remove as small a length as possible of the external jacket. Verify that the
external jacket is well inside the sealing cover when connected to the unit, to
ensure good sealing.
Pull back the shield drain wire before inserting the cable into the RJ-45
connector, to ensure a good connection with the connector's shield after
crimping.
The IDU-ODU cable provides pin-to-pin connection on both ends.
The following figure shows the required wire pair connections.
28
Table 2-1
.The length of the Indoor-to-Outdoor cable should not exceed 90
BreezeMAX CPEs Product Manual
)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Breezemax si cpe

Table of Contents