3 Operation & Display Panel
In this chapter, the SmartAisle product including power before checking, power, system debugging
and shutdown will be explained in detail.
3.1 Checks prior to Start
The following checklist needs to be screened through to confirm if all the following items and
parameters are met:
Table 3-1 Checklist prior to Start
Types of
parameters
All cables, circuit connectors tightened, no loosening of the fastening screw
And base building has been a reliable connection
Mechanical
Fasteners for transportation have been removed
After installation is complete, or debris inside the device have been removed
around (e.g., shipping materials, construction materials, tools, etc.)
Follow the instructions on the label at the valve, opening all the valves in the
refrigerant circuit
The Cooling pipe system has been qualified pressure leak test and confirm
The humidification system for drainage pipe system and is firmly connected to
the material in accordance with claim leak
Ensure proper refrigerant charge
Compressor plus tropical warm-up has been more than 12 hours
It located above the room temperature and 18 ℃ has a certain heat load. If not
Cooling
provided, preferably by using other heating means or manual operation of the
unit itself and force the adjacent heater equipment (sure to follow the method
of operation "Liebert.CRV + Series User Manual precision air conditioning
air"), while preheating to the room environment, to ensure heat load
necessary debugging
Confirmation level switch cable is connected and the float rod may work level
Outdoor air-cooled condenser power isolation switch has been closed
Measured with a multi-meter voltage feed line is normal, and the same
equipment nameplate rated voltage
The system does not open electrical circuit, short circuit
Supply and
Verify that all electrical wiring or control properly tighten all electrical control
distribution
connectors.
Each sub-closing operation switch, each switch test the mechanical properties
of normal
Industrial rack PDU male female connector installed properly
Illumination
Lighting controller power is properly connected
Line resistance and no bump manual door
Electric
Cable lashing rails in the firm, cannot be involved in the drive gears, belts
door
Remove metallic debris from the rail
The power switch on the controller is properly connected
Roof open
Removing the need to open the top plate fixing screws
Checklist items
Test